TOILETS at Salisbury Railway Station are set to get an overhaul – if plans are approved.
A planning application to Wiltshire Council outlines proposed updates to the toilet block on the island between platforms two and three of the station, which is managed and operated by South Western Railways.
Grade II Listed Salisbury Station has seen a range of internal and external improvements in recent years, with the toilet block set to be overhauled early in 2027.
“The proposed internal refurbishment of the existing public toilets comprises the upgrading of the existing former SWR station design standards with the current finishes (to wall/floor tiling), and replacement of dated sanitary items with modern and more robust units such as wall-mounted wash basin/dryer units (replacing the existing vanity wash basins) and built-in toilet roll holders installed in new WC cubicles,” the application said.
“The combined cosmetic changes as well as the upgraded sanitaryware should provide a marked improvement to the appearance of the existing toilet facilities, and is considered an enhancement to the station environment.”
Changes are only internal and do not affect the building exterior, the application said.
For more details on the plans, and to comment, log on to wiltshire.gov.uk and search application reference PL/2026/06949.
READ MORE: Planning news from your Salisbury & Avon Gazette

The toilets at Salisbury Station are set to get a makeover if plans are approved. Picture: KVB/Wiltshire Council



Leave a Reply